Utah Bids > Bid Detail

USACE SPK Design Build Construction - GBSD Technology and Collaboration Center - Hill AFB, UT

Agency: DEPT OF DEFENSE
Level of Government: Federal
Category:
  • Y - Construction of Structures and Facilities
Opps ID: NBD00159031031608999
Posted Date: Sep 14, 2022
Due Date: Oct 27, 2022
Solicitation No: W9123822R0050
Source: https://sam.gov/opp/75a6e0e74b...
Follow
USACE SPK Design Build Construction - GBSD Technology and Collaboration Center - Hill AFB, UT
Active
Contract Opportunity
Notice ID
W9123822R0050
Related Notice
Department/Ind. Agency
DEPT OF DEFENSE
Sub-tier
DEPT OF THE ARMY
Major Command
USACE
Sub Command
SPD
Office
US ARMY ENGINEER DISTRICT SACRAMENT
General Information View Changes
  • Contract Opportunity Type: Solicitation (Updated)
  • All Dates/Times are: (UTC-07:00) PACIFIC STANDARD TIME, LOS ANGELES, USA
  • Updated Published Date: Sep 14, 2022 07:03 am PDT
  • Original Published Date: Sep 13, 2022 08:50 pm PDT
  • Updated Date Offers Due: Oct 27, 2022 10:00 am PDT
  • Original Date Offers Due: Oct 27, 2022 10:00 am PDT
  • Inactive Policy: Manual
  • Updated Inactive Date: Nov 11, 2022
  • Original Inactive Date: Nov 11, 2022
  • Initiative:
    • None
Classification View Changes
  • Original Set Aside:
  • Product Service Code: Y1AZ - CONSTRUCTION OF OTHER ADMINISTRATIVE FACILITIES AND SERVICE BUILDINGS
  • NAICS Code:
    • 236220 - Commercial and Institutional Building Construction
  • Place of Performance:
    Hill AFB , UT 84056
    USA
Description View Changes

The scope of this project for Design-Build (DB) construction services is to construct a Ground Based Strategic Deterrent (GBSD) Technology and Collaboration Center (TACC) to provide a mix of secure and unclassified office, technical, and collaboration areas sized to accommodate various workgroups and teams necessary to develop and sustain the next generation Intercontinental Ballistic Missile (ICBM) weapon system. New construction will have armor-plated concrete footings and foundation, structural steel frame, insulated walls and roof, lightning protection, fire detection/suppression, and intrusion detection. Finished ceiling heights will be typical for administrative and collaboration areas. Designated areas will be constructed to ICD/ICS 705 technical standards. Secure office and some technical areas will have a raised floor system necessary for distributing and flexibility in reconfiguring multiple systems. The project includes a ground-level parking area with curbs and lighting to support both office and collaboration areas, all supporting utilities such as water, storm water and sanitary sewer, and communications connections, plus roadway improvements with curb, gutter, and sidewalks necessary to integrate the facility into the base system. In accordance with DFARS 236.204(ii) the magnitude of construction is estimated to be between $25,000,000 and $100,000,000.BE ADVISED THAT THIS PROJECT MAY BE DELAYED, CANCELLED OR REVISED AT ANY TIME DURING THE PRE-SOLICITATION, SOLICITATION, SELECTION, EVALUATION, NEGOTIATION AND/OR FINAL AWARD PROCESS. *Visit 'https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?solNo=W9123822R0050' to obtain more details.*


Attachments/Links
Contact Information View Changes
Contracting Office Address
  • KO CONTRACTING DIVISION 1325 J STREET
  • SACRAMENTO , CA 95814-2922
  • USA
Primary Point of Contact
Secondary Point of Contact


History

TRY FOR FREE

Not a USAOPPS Member Yet?

Get unlimited access to thousands of active local, state and federal government bids and awards in All 50 States.

Start Free Trial Today >