UT FLAP 2016(1) Lion Boulevard
Agency: | TRANSPORTATION, DEPARTMENT OF |
---|---|
Level of Government: | Federal |
Category: |
|
Opps ID: | NBD00159312777722305 |
Posted Date: | Feb 15, 2023 |
Due Date: | |
Solicitation No: | 6982AF23B000011 |
Source: | https://sam.gov/opp/858ed5c4e2... |
Procurement Technical Assistance Centers (PTACs) are an official government contracting resource for small businesses. Find your local PTAC (opens in new window) for free government expertise related to contract opportunities.
- Contract Opportunity Type: Presolicitation (Original)
- All Dates/Times are: (UTC-05:00) EASTERN STANDARD TIME, NEW YORK, USA
- Original Published Date: Feb 15, 2023 10:52 am EST
- Original Response Date:
- Inactive Policy: Manual
- Original Inactive Date: Mar 15, 2023
-
Initiative:
- None
- Original Set Aside:
- Product Service Code: Y1LB - CONSTRUCTION OF HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS
-
NAICS Code:
- 237310 - Highway, Street, and Bridge Construction
-
Place of Performance:
Springdale , UTUSA
THIS IS NOT AN INVITATION FOR BID, PLANS AND SPECIFICATIONS ARE NOT AVAILABLE AT THIS TIME.
PROJECT NUMBER: UT FLAP 2016(1)
PROJECT NAME: Lion Boulevard
PROJECT DESCRIPTION: The UT FLAP 2016(1), Lion Boulevard project is in the Town of Springdale in southwestern Utah near Zion National Park. There is an increasing number of visitors to Zion National Park and, currently, visitors are parking along the road on the unpaved shoulders in undesignated spots. This project widens Lion Boulevard to provide additional parallel on-street parking, as well as curb and gutter and sidewalk. The addition of designated parking spaces and sidewalk will provide safe pedestrian access to the Zion Shuttle System, which provides free transit into Zion National Park.
SCOPE OF THE WORK: This project length is approximately 0.30 miles and includes widening Lion Boulevard to the south to provide additional parallel on-street parking, as well as curb and gutter and sidewalk (with ADA ramps), in an urban setting. Other work includes permanent striping, installation of conduit and pull boxes for future utility use, and fence work.
PRINCIPAL WORK ITEMS:
- 20401-0000 Roadway Excavation: 400 CUYD
- 30202-2000 Roadway Aggregate, Method 2: 550 TON
- 40301-0100 Asphalt Concrete Pavement, Type 1: 150 TON
- 60902-1200 Curb and Gutter, Concrete, 14-Inch Depth (1’ Gutter Pan) (Colored): 450 LNFT
- 60902-1200 Curb and Gutter, Concrete, 14-Inch Depth (2’ Gutter Pan) (Colored): 950 LNFT
- 60906-1000 Gutter, Concrete (Colored): 55 SQYD
- 61501-0100 Sidewalk, Concrete (Colored): 800 SQYD
- 63501-0000 Temporary Traffic Control: LPSM
- 63610-1600 Conduit, 2-Inch PVC: 4,400 LNFT
- 63610-2800 Conduit, 4-Inch PVC: 1,000 LNFT
ANTICIPATED SCHEDULE:
- Advertisement: February 2023
- Contract Award: May 2023
- Notice to Proceed: May 2023
- Construction Complete: August 2023
On-site construction work to begin after Memorial Day with the goal of being completed before Labor Day (these two holidays are the busiest times of the year for Zion National Park).
ESTIMATED COST RANGE:
- The estimated price range of the project work is between $250k - $700k.
MISCELLANEOUS:
- Restore two lanes of travel and one lane of parking on holidays.
- Night and/or weekend work will require prior approval by the CO and Town of Springdale.
- Maintain vehicle and pedestrian access through the project and to all accesses within project limits.
- Utility relocates anticipated during construction by the utility owner will require coordination.
- Remove and reset private fence within Town of Springdale right-of-way.
- 12300 W. DAKOTA AVE
- LAKEWOOD , CO 80228
- USA
- Leslie Karsten
- CflContracts@dot.gov
- Feb 15, 2023 10:52 am ESTPresolicitation (Original)
- Jan 28, 2023 11:58 pm EST Sources Sought (Inactive)
TRY FOR FREE
Not a USAOPPS Member Yet?
Get unlimited access to thousands of active local, state and federal government bids and awards in All 50 States.