Utah Bids > Bid Detail

Request for Information Deployable Debriefing Facility Next Generation (DDF-X)Shelter

Agency: DEPT OF DEFENSE
Level of Government: Federal
Category:
  • 54 - Prefabricated Structures and Scaffolding
Opps ID: NBD00159356027662732
Posted Date: Mar 21, 2023
Due Date: Apr 17, 2023
Solicitation No: FA821723DDFX
Source: https://sam.gov/opp/4e57ac4bdc...
Follow
Request for Information Deployable Debriefing Facility Next Generation (DDF-X)Shelter
Active
Contract Opportunity
Notice ID
FA821723DDFX
Related Notice
Department/Ind. Agency
DEPT OF DEFENSE
Sub-tier
DEPT OF THE AIR FORCE
Major Command
AFMC
Sub Command
AIR FORCE LIFE CYCLE MANAGEMENT CENTER
Sub Command 2
BATTLE MANAGEMENT
Office
FA8217 AFLCMC HBZK
Looking for contract opportunity help?

Procurement Technical Assistance Centers (PTACs) are an official government contracting resource for small businesses. Find your local PTAC (opens in new window) for free government expertise related to contract opportunities.

General Information View Changes
  • Contract Opportunity Type: Sources Sought (Updated)
  • All Dates/Times are: (UTC-06:00) MOUNTAIN STANDARD TIME, DENVER, USA
  • Updated Published Date: Mar 21, 2023 12:07 pm MDT
  • Original Published Date: Mar 16, 2023 05:32 pm MDT
  • Updated Response Date: Apr 17, 2023 02:00 pm MDT
  • Original Response Date: Apr 17, 2023 02:00 pm MDT
  • Inactive Policy: Manual
  • Updated Inactive Date: Dec 31, 2023
  • Original Inactive Date: Dec 31, 2023
  • Initiative:
    • None
Classification
  • Original Set Aside:
  • Product Service Code: 5411 - RIGID WALL SHELTERS
  • NAICS Code:
    • 541990 - All Other Professional, Scientific, and Technical Services
  • Place of Performance:
    Hill AFB , UT 84056
    USA
Description View Changes

Update: 21 March 2023



An update was done to this RFI with the following edits:



1. The SOW document was edited to add reference to the Tactical Sensitive Compartmented Information Facility (T-SCIF).



Edits are found on the Title, Section1.0 Objective, and Section 2.0 Background.



The edits were highlighted to help faciliate their locations.



2. The date on the front page was updated to read, "21 March 2023"



3. This updated SOW ("DDF X SOW (21 March)") has replaced the version that was originally attached on the 16 March 2023 notice.





No other changes were performed.



The due date on this RFI remains unchanged.



*********





Description



NOTE: This is not a solicitation but rather a Sources Sought Synopsis to determine potential sources for information and planning purposes only.



1.0 OBJECTIVE



Request for Information ONLY



The objective of this effort is to design a replacement shelter modification for the legacy DDF-3000 modification using the S-786/G US Army standard tactical shelter, which functioned as a Tactical Sensitive Compartmented Information Facility (T-SCIF). There is a need and an opportunity to provide the warfighters a new DDF modification incorporating 20 years of lessons learned from the DDF-3000’s service during the Global War on Terror. By providing the contractor the S-786/G standard shelter technical data, the legacy DDF-3000 technical data, and a list of required modifications they will develop the new DDF-X modification technical data package and technical orders. Integrating the most current T-SCIF requirements into the DDF-X modification is a critical requirement. Validation and verification of the modification will be conducted on a GFE S-786/G shelter which will be retained by the Tactical Shelters, Radomes, and Towers (TSRT) office.



2.0 BACKGROUND



The current USAF TSRT program office supported Deployable Debriefing Facility (DDF-3000), which is a modification for the S-786/G standard shelter, is over 20 years old. It has seen continuous field service during that time, functioning as a T-SCIF. In managing its lifecycle, the program office has had feedback both from warfighters and tactical shelter maintenance personnel in its successes and challenges. Our primary tactical shelter maintenance depot (OO-ALC) has informed us that many of the components used in the DDF-3000 are no longer procurable, making refurbishment of the existing fleet or conversion of new base S-786/G shelters into DDF-3000s impossible. The changes required to the original drawings and T.O. to make the DDF-3000s supportable again are too extensive to be practical. A replacement effort, using warfighter and depot feedback, has been determined as the best way forward for increasing demand for DDF type shelters. TSRT would use this opportunity to incorporate suggested DDF features from the US Army shelter office’s LMERWS (F-35 Lightning Modular Expandable Rigid Wall System) shelter project for which TSRT will likely inherit some lifecycle support responsibility, at a future date. Additionally, USAF users have gone to the private sector to purchase Commercial Off the Shelf (COTS) DDF-type shelters over the course of the GWOT, which they have come to TSRT to support as they age. We cannot effectively support the lifecycle of COTS shelters as their design is proprietary and they are not parts supportable. This modification would provide a design that can be acquired by units in need of DDF-type shelters which can be supported by a USAF depot for their entire lifecycle.



More Information can be found on the attached documents:.



DDF X SOW (21 March).pdf

DDF-X Attachment A.docx

DDF-X Attachment B (TCMR).docx



3.0 REQUESTED INFORMATION



The following information is requested from respondents along with a capability statement of no more than 3 single – sided pages:

Company Name:

Cage Code:

POC:

Telephone #:

Fax #:

POC Email:

Company Web Site:

4.0 RESPONSES



It is suggested interested parties respond to this RFI with a whitepaper.

4.1 RFI Whitepaper. A RFI whitepaper should be in Microsoft 365 Word compatible format and due NLT 17 April 2023, 1400 MT. A different NAICS code can be included in the whitepaper. Any response is limited to 5 single-sided pages and submitted via e-mail only to the Government Point of Contract (POC): Wendy Farley, Contracting Officer, wendy.farley@us.af.mil and Contract Specialist, Carlos Michel, carlos.michel@us.af.mil.

4.2 Proprietary information, if any, should be kept to minimum and MUST BE CLEARLY MARKED. To aid the Government, segregate proprietary information. Please be advised that all submissions become Government property and will not be returned. If any respondent does not currently have a Proprietary Data Protection Agreement (PDPA) that would permit the Government’s personnel to review and evaluate the submitted whitepaper in response to this RFI, the respondent should request to sign PDPAs with the Government.

4.3 Please note that all CRC Program Office government or contractor personnel have executed Non Disclosure Agreements (NDA) for all related project information.



5.0 QUESTIONS



Questions and responses regarding this RFI should be submitted in writing by e-mail to the CRC Program Office Contracting Officer, Wendy Farley, wendy.farley@us.af.mil and Contract Specialist, Carlos Michel, carlos.michel@us.af.mil.



6.0 SUMMARY



This RFI is only intended for the Government to identify sources that can provide DDF-X Deployable Debriefing Facility Next Generation Shelter support. The information provided in this RFI is subject to change and is not binding to the Government. The Government has not made a commitment to procure any of the RFI requirements discussed, and release of this RFI should not be construed as such a commitment or as authorization to incur cost for which reimbursement would be required or sought. All submissions become Government property and will not be returned.


Attachments/Links
Contact Information View Changes
Contracting Office Address
  • CP 801 586-8482 6039 WARDLEIGH RD BLDG 1206
  • HILL AFB , UT 84056-5838
  • USA
Primary Point of Contact
Secondary Point of Contact
History

TRY FOR FREE

Not a USAOPPS Member Yet?

Get unlimited access to thousands of active local, state and federal government bids and awards in All 50 States.

Start Free Trial Today >